A Round Up of Garden Renovation Posts

Just in case you are missing all of the posts about our garden renovation project (I’m not!), or if you missed seeing part of the process unfold, here is a list of all the posts from the past 6+ months about our renovation.

Demolition, from last fall.

Day 1, Dirt Work (Feb. 28th)

Days 2 & 3, Layout & Drainage (Mar. 9th)

Days 4 & 5, Drainage & Shade Structure Layout (Mar. 14th)

Days 6 & 7, Shade Structure Construction (Mar. 19th)

Days 8-11, Shade Structure Construction (Mar. 23rd)

Days 12-16, Shade Structure & Demo Table (Mar. 30th)

Days 17-19, More Drainage & Paver Prep (Apr. 5th)

Days 19-20, Gravel & Laying Pavers (Apr. 9th)

Days 21-24, Laying Brick & Pavers (Apr. 17th)

Day 25, First Raised Beds (Apr. 18th)

Days 26-28, More Raised Beds and FINAL Drainage (Apr. 26th)

Days 28-30, FINAL Pavers and Raised Beds (May 2nd)

Raised Bed Soil Mix (May 7th)

Garden Renovation: Almost the End – Soil Mix (May 9th)

Installing the Drip Irrigation (May 15th)

There you have it! Not counting the demolition, that covers 2 1/2 months of garden renovation. Actual days where work was being done looks to total up to about 34 or so. Yikes!

About Rebecca

I'm a Horticulture Educator with Sedgwick County Extension, a branch of K-State Research and Extension, located in Wichita, KS. I teach about fruits, vegetables, and herbs.

Posted on May 24, 2012, in Working in the Garden and tagged . Bookmark the permalink. Leave a comment.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: