Just in case you are missing all of the posts about our garden renovation project (I’m not!), or if you missed seeing part of the process unfold, here is a list of all the posts from the past 6+ months about our renovation.
Demolition, from last fall.
Day 1, Dirt Work (Feb. 28th)
Days 2 & 3, Layout & Drainage (Mar. 9th)
Days 4 & 5, Drainage & Shade Structure Layout (Mar. 14th)
Days 6 & 7, Shade Structure Construction (Mar. 19th)
Days 8-11, Shade Structure Construction (Mar. 23rd)
Days 12-16, Shade Structure & Demo Table (Mar. 30th)
Days 17-19, More Drainage & Paver Prep (Apr. 5th)
Days 19-20, Gravel & Laying Pavers (Apr. 9th)
Days 21-24, Laying Brick & Pavers (Apr. 17th)
Day 25, First Raised Beds (Apr. 18th)
Days 26-28, More Raised Beds and FINAL Drainage (Apr. 26th)
Days 28-30, FINAL Pavers and Raised Beds (May 2nd)
Raised Bed Soil Mix (May 7th)
Garden Renovation: Almost the End – Soil Mix (May 9th)
Installing the Drip Irrigation (May 15th)
There you have it! Not counting the demolition, that covers 2 1/2 months of garden renovation. Actual days where work was being done looks to total up to about 34 or so. Yikes!